久久久噜噜久没久久久噜噜_无码人妻丰满熟妇区毛片_国产超爽人人爽人人做人人爽_色天使久久综合网天天堂

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


灌云县| 天峻县| 汤阴县| 广饶县| 青冈县| 温泉县| 安仁县| 嵊州市| 临邑县| 伊金霍洛旗| 东海县| 阿拉尔市| 平顶山市| 太仆寺旗| 丹巴县| 西乡县| 布尔津县| 镇宁| 阳谷县| 柳州市| 赤水市| 饶阳县| 徐州市| 霸州市| 永宁县| 独山县| 乐安县| 信宜市| 西青区| 信阳市| 高邑县| 安陆市| 阜新| 游戏| 五大连池市| 德清县| 工布江达县| 天祝| 仁寿县| 揭东县| 郓城县|